SteadyFloor for Discrete Manufacturing
Multi-level routings, scheduled as one.
Synchronise fabrication, sub-assembly and final assembly so components arrive just in time for the parent order.
The challenge
Sound familiar?
Complex BOMs
Sub-assemblies scheduled in isolation.
Shared bottlenecks
Machines fought over by every order.
High mix, low volume
Every job is a little different.
With SteadyFloor
What changes
- Multi-level BOM synchronisation
- Bottleneck-first scheduling
- Skill-based labour assignment
- Serial traceability
On-time96.4%
OEE78.2%
Open WOs142
Checks passed99.1%
CNC-01
CNC-02
PRESS-3
WELD-A
PAINT
ASSY-1
Platform
The modules behind it
See your plant run on SteadyFloor.
Bring two weeks of real orders. We'll build a live schedule on your bottleneck in the demo.